Build, FAT and Electrical Test
Rack Build
Systems build
is a key component of Optilan’s work.
Our Coventry site incorporates a 1500 Square
metre staging facility dedicated specifically
to the production of equipment cabinets, &
racks. The facility is capable of building in
excess of 200 19” racks simultaneously.
Factory Acceptance
Test
Also at Coventry is Optilan in-house FAT testing facility – all telecoms and security systems are subject to full FAT testing.
Project-specific tests are designed to the client procurement specification and to demonstrate all system functionality and measure all relevant system parameters and levels as required.
Factory acceptance testing
is geneally undertaken by Project Engineering
Teams and is generally conducted in the main
FAT workshop, which is fully equipped with fibre
optic, voice, data and RF test equipment. However,
some large projects which involve very high
levels of in-house test activity have their
own dedicated secure FAT rooms at Optilan. |