Coventry to Nuneaton Rail Upgrade (NUCKLE Phase 1)
09 October 2017
Case Study
Project Scope
Client
Buckingham Group Contracting Limited and Orton Group
Contract Length
8 months
Location
Coventry, Nuneaton and Bedworth (West Midlands)
Services Provided
  • Telecoms Supply
  • Installation and Commissioning

Project Overview

The main scope of the Coventry to Nuneaton rail upgrade was to improve the current rail services between Coventry and Nuneaton. Phase 1 of the project saw the development of two new stations managed by London Midland. The stations are situated at the Coventry Ricoh Arena and Bermuda Park in Warwickshire where over 500,000 passengers are expected to use the stations per year. The project will also provide extensions to the existing platforms at Bedworth station.

Client

Working into Buckingham Group Contracting Limited and Orton Group, whom are leading suppliers of civil engineering, electrical and mechanical works.

Optilan Project Solutions

The objective of the overall project was to provide improved transport links between Nuneaton, Bedworth and Coventry. In support of this project Optilan were contracted to supply, install, test and commission (GRIP stage 6-8) Station Information and Surveillance Systems (SISS) to the new stations being built at Coventry Arena and Bermuda Park Station. This also includes the platform extension works at Bedworth Station. The Optilan scope of works involved the provision of new Customer Information System (CIS) displays - which provide automated visual “next train” and departure summary” information, automated long line public address, passenger help points and CCTV monitoring and recording equipment.

In support of this project Optilan supplied and installed:

  • Telecoms Equipment Cabinets
  • Long Line Public Address Systems
  • CCTV Systems
  • Customer Information Systems
  • Passenger Help Point Systems
  • Power and data cabling for Telecoms equipment
  • UPS and battery back-up

Optilan have extensive workshop facilities at our headquarters in Coventry. This allowed the equipment racks to be assembled and wired up in a secure environment fully equipped and designed for the purpose. In addition this also enabled us to configure and test all equipment prior to its installation on site and ensure that all equipment is fully tested and configured prior to delivery at site. Our project engineers can arrange full Factory Acceptance Testing of new systems if required.
 