Build/FAT
Build
& Assembly
Rack building, equipment cabinets and field
equipment assembly all take place at Optilan’s UK
workshops. The workshops cover over 3,000 square metres
in total, providing the capability to assemble about 200 racks at any
one time.
Factory Acceptance Test
Optilan systems are subjected to full FAT
testing and pre-commissioning prior to shipping.
Project-specific test specifications are
developed for all subsystems and passed to the client for prior
approval. Tests can be included to demonstrate all system
functionality and to demonstrate and measure all relevant system
parameters and levels.
Factory
acceptance testing is undertaken by Project Engineering Teams and is
generally conducted in Optilan’s main FAT workshop, which is fully
equipped with voice, data RF and fibre
optic test equipment. Larger projects with very high levels of
in-house activity, however, have their own dedicated secure FAT rooms
|